Mobilization
What is Mobilization?
Mobilization in the construction industry refers to the activities and processes that are carried out to prepare for a construction project before the actual work begins. This can involve acquiring, assembling, and organizing resources, including manpower, tools, equipment, and materials needed for the project. Moreover, it encompasses planning, site preparation, setting up temporary facilities like offices or storage spaces, and obtaining necessary permits and insurances. Mobilization is crucial as it ensures smooth execution and helps to avoid potential delays. This phase often involves significant costs, which are usually included in the contract as 'Mobilization Costs'.
Trusted by trade contractors across the country












Other construction terms
What is a Job Cost Structure?
A Job Cost Structure in the construction industry refers to the detailed categorization and allocation of costs associated with a specific construction job or project. These costs are typically divided into direct and indirect costs. Direct costs include materials, labor, and equipment used specifically for the project. Indirect costs, also known as overheads, include costs that support the project such as administrative expenses, insurance, and utilities. The job cost structure enables managers to monitor project expenses closely, helping in managing budget and ensuring project profitability. It is a fundamental element in construction project management, improving cost control and financial accuracy.
What is an Allowance?
In construction, an allowance is a predetermined dollar amount included in a contract to cover materials, fixtures, or finishes that haven’t yet been selected. Allowances are typically used for flooring, lighting fixtures, plumbing fixtures, appliances, or other finish materials (things that contribute to the project’s aesthetic) where the owner may want flexibility to make selections as the project evolves.
Here’s how allowances work: When contractors bid on a project, they’ll include specific allowance amounts (e.g., $5,000 flooring allowance). Once construction begins and the owner chooses actual materials, the costs are reconciled against the allowance. If the materials cost less, they receive a credit. If more, the owner pays the difference via a change order.
Siteline can help you track and manage those change orders, ensuring you get paid for that difference. Learn more about how Siteline streamlines change order management here.
What are Liquidated Damages?
Liquidated damages in the construction industry are a pre-agreed sum specified in a construction contract, which the contractor will pay to the client in the event of a breach of contract, typically when there are delays in completion. This contract clause serves as a protection mechanism for the client, giving an estimate of the potential loss they might incur due to the delay. However, liquidated damages must be a genuine pre-estimate of loss, not a penalty. They are not intended to be a punishment, but a compensation for the client's actual anticipated loss. This approach mitigates the risks and provides predictability for both parties in a construction project. One party cannot claim more than the contracted liquidated damages. They bring certainty to the potentially complex process of calculating actual damages in construction delays, thus fostering an efficient dispute resolution.